Program Net Metering
Category Regulatory Policy
Implementing sector State
Last Update
State Wisconsin
Website https://psc.wi.gov/Pages/ForUtilities/Energy/NetMeteringandBuyBackTariffs.aspx
Technologies Solar Thermal Electric, Solar Photovoltaics
Sectors Residential

The Public Service Commission of Wisconsin (PSC) issued an order on January 26, 1982, requiring all regulated utilities to file tariffs allowing net metering to customers that generate electricity with systems up to 20 kilowatts (kW)* in capacity.

Eligibility and Availability

The order applies to investor-owned utilities and municipal utilities, but not to electric cooperatives. All distributed-generation (DG) systems, including renewable energy and combined heat and power (CHP) systems, are eligible. There is no limit on total enrollment.

Net Excess Generation

The PSC has not adopted administrative rules for net metering.** Utilities' net-metering tariffs contain some variations. Customer net excess generation (NEG) is generally credited at the utility's retail rate for renewable energy, and at the utility's avoided-cost rate for non-renewable energy. NEG credit is carried over to the customer's next bill. If NEG credit exceeds $25, then the utility must issue a check for the amount, payable to the customer. 

In December 2011, the PSC approved a process for Xcel Energy to reconcile NEG credits to customers on an annual basis at the avoided-cost rate.

Investor-Owned Utility Net Metering Tariffs

For more information on net metering, refer to the applicable utility net metering tariffs listed below. The Public Service Commission also maintains a listing of utility tariffs that can be used to access your utility's net metering tariff if it is not listed here.

* Some utilities allow net metering for systems larger than 20 kW. In these cases, excess generation rates, carry-over processes, and capacity limits vary by utility. These provisions are specified in the utility tariffs.

** Subsequent PSC decisions issued June 21, 1983 in docket numbers 05-ER-11, 05-ER-12 and 05-ER-13, further implemented Sections 201 and 210 of the federal Public Utility Regulatory Policy Act of 1978 (PURPA). These decisions were confirmed by an order issued September 18, 1992, in docket number 05-EP-6. This last order addresses net metering as it applies to Wisconsin's investor-owned utilities.

 