Lumbee River EMC - Solar Water Heating Loan Program

Lumbee River EMC is offering 6% loans to residential customers for the installation of solar water heaters on their homes.  To qualify, the systems must be certified OG-300 by the Solar Ratings and Certification Council (SRCC) and installed by a program-approved contractor or an installer certified by the North American Board of Certified Energy Practitioners (NABCEP). Loans of $2,000 or less will be secured as a signature loan. Loans in excess of $2,000 will be secured by a deed of trust against the home and property.  

Last Update

Miami-Dade County - Florida PACE Finance Programs

Note:  In 2010, the Federal Housing Finance Agency (FHFA), which has authority over mortgage underwriters Fannie Mae and Freddie Mac, directed these enterprises against purchasing mortgages of homes with a PACE lien due to its senior status above a mortgage. Most residential PACE activity subsided following this directive; however, some residential PACE programs are now operating with loan loss reserve funds, appropriate disclosures, or other protections meant to address FHFA's concerns. Commercial PACE programs were not directly affected by FHFA’s actions, as Fannie Mae and Freddie Mac do not underwrite commercial mortgages. Visit PACENation for more information about PACE financing

Last Update

Orange County - Development Standards for Small Wind Energy Systems

In December 2010, the County of Orange Board of Supervisors adopted small wind performance and development standards (Ord. No. 10-020) in order to promote distributed generation systems in non-urbanized areas (as defined in Government Code Section 65944(d)(2)) within the unincorporated territory. Permitting standards are for systems of 50 kW or less per customer site, for which the energy is primarily for on-site consumption.

Height: For systems 45 feet tall or less, a use permit must be approved by the Zoning Administrator, and for systems between 45 and 80 feet in height, the use permit must be approved by the Planning

Last Update

San Diego County - Design Standards for County Facilities

The San Diego County Board of Supervisors established design standards for county facilities and property. Among other requirements,  the policy requires that all new county buildings or major building renovations obtain U.S. Green Building Council (USGBC) LEED Building Certification. Renovations of over 5,000 square feet  are considered major renovations. Buildings over 10,000 square feet require LEED Enhanced Commissioning. Additionally, county projects are required to attain the lowest EUI (Energy Use Intensity) possible within the client's program and project's budget. County projects are also required to exceed the current California Energy Code Title 24 by at least 20%.

Last Update

San Diego County - Wind Regulations

The County of San Diego has established zoning guidelines for wind turbine systems of varying sizes in the unincorporated areas of San Diego County. Wind turbine systems can be classified as small or large, and have different siting requirements. Turbines of all sizes must abide by Noise Abatement and Control laws, must have restricted public access using locked fences, non-climbable towers, or other restrictions, and must have appropriate warning signs posted.  A wind turbine is considered non-operational if it produces less than 10% of the expected power output for 12 consecutive months.

Small Wind Turbine System: An installation consisting

Last Update

City of Danville - Net Metering

For a renewable fuel generator with a capacity of 25 kilowatts (kW) or less, a notification form shall be submitted at least 30 days prior to the date the customer intends to interconnect their renewable fuel generator to the utility's facilities. Renewable fuel generators with a capacity over 25 kW are required to submit forms no later than 60 days prior to planned interconnection. The utility will review and determine whether the requirements for Interconnection have been met. More information on this process may be found in the Danville Utilities' Electric Rate Schedule and Riders.

A customer may begin

Last Update

Sales Tax Credit for Clean Energy Technology

Tenn. Code Ann. Section 67-6-346 allows a taxpayer to take a credit, apply for a refund of taxes paid, or to apply for authority to make tax-exempt purchases of machinery and equipment used to produce electricity in a certified green energy production facility. A certified green energy production facility is a facility certified by the Department of Environment and Conservation as producing electricity for use and consumption off the premises using clean energy technology. Clean energy technology is a technology used to generate or store electricity from geothermal, hydrogen, solar, or wind sources. CHP facilities utilizing natural gas for heat

Last Update

CoServ - Solar Energy Rebate

CoServ Electric Cooperative provides a rebate to its members who installation a solar energy system on their property. Customers must sign an interconnection agreement (with net metering) for on-site generation with CoServ. Any excess generation from the system will be given to CoServ without compensation.

Interested customers are encouraged to contact the utility for more details before making investment decisions.

Last Update

City of Milwaukee - Milwaukee Shines Solar Financing

Beginning July 28, 2011, the City of Milwaukee will be offering low-interest loans for solar energy under its Milwaukee Shines Solar Financing program. Loans are available to homeowners of 1-3 unit, owner-occupied homes in Milwaukee. Interest rate maximum is prime rate plus 2.5%, and as low as prime plus 1.5%. Loans are limited to $20,000 and 15 years. Eligible equipment includes solar electric systems of up to 6 kilowatts (kW) and solar hot water systems of up to 8 panels. Projects must be installed by a Focus on Energy Residential Ally installer. Installers can be found here. Eligible expenses

Last Update
Subscribe to