Renewable Energy Professional Certification

H.B 8200 enacted in June, 2014 requires all ancillary non-electrical renewable energy work such as advertising, distribution and installation be performed by a person, firm or corporation holding a Renewable Energy Professional (REP) Certificate . All the renewable energy electrical work, including installation, connecting, testing, mounting of modules and inverters are to be performed by a licensed electrician.  Except for electrical work, the contractors require REP certification for installation, mechanical fastening and conjoining of listed solar sheathing system that are 10 kW or less. REP certification is also required for to any person, firm or corporation who is engaged in

Last Update

Renewable Energy Growth Program

In 2014, H.B. 7727 created the Renewable Energy Growth (REG) program with the goal to promote installation of grid connected renewable energy within the load zones of electric distribution companies (EDCs) at a reasonable cost. This tariff-based incentive program is designed to finance the development, construction, and operation of renewable energy distributed generation projects through competitive bidding processes over five years to achieve specific megawatt (MW) targets. This program is implemented by the EDCs under supervision and review of the Public Utilities Commission (PUC).

For the period of at least five years, the EDCs shall file tariffs with the PUC

Last Update

SouthCarolinaSaves Green Community Loan Program

The SouthCarolinaSAVES™ Green Community Loan Program affords low cost financing to South Carolina governmental, institutional, and commercial and industrial properties for qualified conservation measures, including lighting, HVAC, controls, envelope, process improvement upgrades, solar photovoltaic systems, and LNG/CNG or propane fleet conversions. A below market rate is enabled through the use of Qualified Energy Conservation Bonds allocated by the South Carolina Energy Office and issued through the South Carolina Jobs-Economic Development Authority (JEDA).

Projects are eligible to receive between $500,000 and $5,000,000 of low cost financing and must have a payback period of 15 years.

For more information about the SCSAVES

Last Update

Oklahoma Solar and Wind Access Law

Oklahoma enacted S.B. 1787 in 2010, which states that access to the airspace is tied to the ownership of the land and any wind or solar leasing arrangements associated with the airspace must be made with the landowner that owns the land below the air: “No interest in any resource located on a tract of land and solely associated with the production or potential production of wind or solar-generated energy on the tract of land may be severed from the surface estate except that such rights may be leased for a definite term pursuant to the provisions of this act,”

Last Update

Agricultural Energy Loan Program

The Agricultural Energy Loan Program (AELP), created through Act 87 in 2013, is administered by the Vermont Agricultural Credit Corporation (VACC). The AELP provides loans to agriculture- or forest-product-based companies for renewable energy and energy efficiency projects. 

The maximum loan amount is $5,000,000, and the percentage of the project funded by VACC is negotiable. Loans are provided at variable rates, although fixed rates may be available in some circumstances; current rates can be found here. Loan terms are determined on a case-by-case basis.

Fees associated with AELP loans include a 1% commitment fee ($5,000 maximum); a $30 credit report fee

Last Update

Commercial Energy Loan Program

The Commercial Energy Loan Program (CELP), created by Act 87 in 2013, is administered by the Vermont Economic Development Authority (VEDA). The CELP provides loans to businesses for larger renewable energy and energy efficiency projects.

The maximum loan amount is $6,000,000 for the variable option and $500,000 for the fixed rate option, and VEDA is generally limited to 60% of the project cost; and in some cases up to 90% of cost financing (up to $500,000). Loans are provided at variable rates, which are adjusted on a quarterly basis; current rates can be found here. Loan terms are determined on a

Last Update

Small Business Energy Loan Program

The Small Business Energy Loan Program (SBELP), created by Act 87 in 2013, is administered by the Vermont Economic Development Authority (VEDA). The SBELP provides loans to businesses for smaller renewable energy and energy efficiency projects. 

The maximum loan amount is $500,000, and VEDA will fund up to 60% of the project. However, in certain cases, VEDA may provide loans under $50,000 that cover up to 75% of project costs. Loans are provided at fixed rates; current rates can be found here . Loan terms are determined on a case-by-case basis, but the maximum loan term is generally 10 years with a

Last Update

Distributed Energy Resource Program

S.B. 1189 of 2014 established a voluntary Distributed Energy Resource Program. The legislation allows participating utilities to recover costs connected to meeting a 2021 target of 2% aggregate generation capacity from renewable energy sources. Facilities sized between 1 MW and 10 MW will make up 1% of aggregate generation (50% of the total target) while facilities sized under 1 MW will make up another 1% (another 50% of the total target). Twenty five percent of facilities under 1 MW must also be under 20 kW (12.5% of the total target). Renewable energy resources include solar PV, solar thermal, wind, hydroelectric

Last Update

Commercial Solar Property Tax Exemption

The following property tax exemptions for solar facilities are available in Virginia:

100% property tax exemption for the assessed value of equipment and facilities used in:

  1. Projects equaling 20 MW or less that serve a public institution of higher education or private college.
  2. Projects equaling 5 MW or less.

80% property tax exemption for the assessed value of equipment and facilities used in:

  1. Other projects over 5 MW and less than 150 MW. The exemption for projects greater than 20 MW shall not apply to projects upon which the construction begins after January 1, 2024.

The law broadly defines eligible solar

Last Update
Subscribe to